Steel detailing is the most critical part of any construction project. A minor error can cause devastating affect which is hard to visualize on visualize on paper or even in a 3D model. This fact stands strong when erection takes place, such as clearance for tools or beam placement. And yet erection is where issues and conflicts cost the most—as the industry adage goes, errors cost $10 for a detailer to fix, $100 for the fabricator, and $1000 for the erector (Source – SDS/2). SDS/2 software is built at a solution provider level considering the end goal of any project. Their advanced erectability intelligence minimises job site complications by reducing possible human errors and with accurate connection design calculations. Below are 10 common field issues widely observed at job sites;